Reshaping the Future

Jill Beard, David Ball

Abstract


A 5.3 million pounds sterling refurbishment and new build library project was undertaken by Bournemouth University. First inception to latest adaptation spans 2000–2008. The project gave equal weight to the refurbishment and new build and the building was opened in 2003. The philosophy was one of seeking a design that would allow adaptation and change. Winning the SCONUL building award 2007 is testament to the success of designing and implementing space and service delivery in a way that is sympathetic to developing pedagogy, student expectations and the University's plans.

Keywords


Refurbishment; Academic Libraries; New Build; Adaptable Library Design

Full Text:

html pdf




This work is licensed under a Creative Commons Attribution 4.0  License.

e-ISSN 2213-056X